Chapter 28 - Special Flood Hazard Area Development Regulations
Division 8 - Subdivision and Other Development Requirements
SEC, 28.8. - SUBDIVISION AND OTHER DEVELOPMENT REQUIREMENTS. The Town council shall take into account flood hazards, to the extent that they are known, in all official actions related to land management use and development.
- New subdivisions, manufactured home parks, annexation agreements,
planned unit developments (PUD), and additions to manufactured
home parks and subdivisions shall meet the damage prevention
and building protection standards of SEC. 28.6 and
SEC.28.7 of this chapter. Any proposal for such development
shall include the following data:
- the base flood elevation and the boundary of the floodplain
(where the base flood elevation is not available from an
existing study, the applicant shall be responsible for calculating
the base flood elevation);
- the boundary of the floodway when applicable; and
- a signed statement by a Registered Professional Engineer
that the proposed plat or plan accounts for changes in the
drainage of surface waters in accordance with the Plat Act
(765 IL Compiled Statutes 205/2).
- the base flood elevation and the boundary of the floodplain
(where the base flood elevation is not available from an
existing study, the applicant shall be responsible for calculating
the base flood elevation);
- Public health standards must be met for all floodplain development.
In addition to the requirements of SEC. 28.6 and SEC. 28.7,
the following standards apply:
- No development in the floodplain shall include locating
or storing chemicals, explosives, buoyant materials, flammable
liquids, pollutants, or other hazardous or toxic materials
below the flood protection elevation unless such materials
are stored in a storage tank or flood-proofed building constructed
according to the requirements of SEC. 28.7
- Public utilities and facilities such as sewer, gas,
and electric shall be located and constructed to minimize
or eliminate flood damage;
- Public sanitary sewer systems and water supply systems
shall be located and constructed to minimize or eliminate
infiltration of flood waters into the systems and discharges
from the systems into flood waters;
- New and replacement on-site sanitary sewer lines or
waste disposal systems shall be located and constructed
to avoid impairment to them or contamination from them during
flooding. Manholes or other above ground openings located
below the flood protection elevation shall be watertight.
- No development in the floodplain shall include locating
or storing chemicals, explosives, buoyant materials, flammable
liquids, pollutants, or other hazardous or toxic materials
below the flood protection elevation unless such materials
are stored in a storage tank or flood-proofed building constructed
according to the requirements of SEC. 28.7
- All other activities defined as development shall be designed so as not to alter flood flows or increase potential flood damages.
